Giles and Paula Add a Room Onto the Side of The House
-
@Madame Buttonfly and I got the disc cutter and the sledgehammer out yesterday, made a larger hole in the garden wall….There's an arch and a gate going on there.....
-
All this construction talk is gonna make Reuben explode…. heh
-
Shaping young minds. Gammel ørn
-
Have you tried using an online calculator? They pretty good as long as you aren't doing anything particularly complex.
Yes, but there are some constraints that I make sure I cater for. Obviously, total drop is important, but I also need to build a stud wall at exactly the right place to meet the bottom riser. I know it's not rocket science, but I want to be 100% certain before we start cutting….
EDIT - Found another that is perfect for what I need - thanks
-
Progress is coming along nicely.
-
I think it looks GREAT….
-
Definitely enjoy seeing the progress
-
I've decided to slow things down a bit. Things are going really well, but I made a cock up with my floor height calcs. so I need to add some more screed else finished floor level will be below DPC. I don't think it will make a blind bit of difference to the functionality of the building, but it's outside of building regs. It'll never be noticed, but I may as well do it right. I need to wait for the current screed to dry naturally (about another 30 days) or put the underfloor heating on to accelerate the drying time. But that means I have to screw up our current kitchen earlier than I wanted too, so on balance, a slow down is more sensible.